1.0 PURPOSE:
To describe standard operating procedure for installation of distilled water plant.
2.0 SCOPE:
The standard operating procedure describes in detail the method of installation of distilled water plant.
3.0 RESPONSIBILITY:
The responsibility of installation of distilled water plant lies with the staff of rank not lower than the maintenance engineer of maintenance department.
The responsibility of preparing, reviewing and approving the standard operating procedure lies with the Manager - Maintenance, Head of Production and Head of QAD respectively.
4.0 METHOD:
4.1 Locate the site where the distilled water plant is to be installed.
4.2 Place the distilled water plant at the desired place and check the level using spirit level.
4.3 Place the UV lamp system at the desired place and give electrical connections.
4.4 Fabricate necessary lines.
5.0 RECORDING :
Nil.