1.0 PURPOSE:
    
    To  describe  a   standard operating  procedure  for  breakdown rectification of an air handling system.
    
2.0    SCOPE:
    
     The standard operating procedure describes in detail the method  to be followed  in breakdown  rectification of an air  handling   system   which  includes  centrifugal  blowers, exhaust blower, filters and diffusers.
    
3.0    RESPONSIBILITY:
    
    The responsibility of carrying out breakdown  rectification  of  an  air handling system  lies with the staff of rank not  lower  than the junior utility operator. 
        
The  responsibility of preparing, reviewing  and approving  the  standard  operating  procedure lies with the  Manager  -  Maintenance,  Head of Production and Head of QAD respectively.
    
4.0    METHOD:
    
4.1        Rectification of burnt motor/damaged blower:                   
    
4.1.1      Isolate the equipment electrically. 
    
4.1.2      Separate the motor/blower from the equipment.                  
    
4.1.3      Send  the motor/blower to outside agency for rectification as per SOP  SENDING  OUT  EQUIPMENT  FOR RECTIFICATION TO THE OUTSIDE AGENCY.
    
4.1.4      After  receiving   the motor/blower from the outside  agency  fix  the  motor/blower to the equipment and check for the proper alignment.
4.1.5      Restore the power supply to the equipment.
    
4.2.0     Rectification of low air inflow: 
    
4.2.1      Isolate the equipment electrically.                         
    
4.2.2      Remove AHU suction filters doors.
    
4.2.3      Remove prefilters and fine filters from the system. 
    
4.2.4      Using air jet (not morethan 1 kg/cm2 pressure) first clean from   nondust  laiden  face of the filter (reverse direction  of  air  flow in system) and then from the other side.
    
4.2.5      Clean  the  filter by hosing with water as  per  the  procedure  mentioned in 4.2.4.
    
4.2.6      Dry  the filter with air jet and fix back them in  the  reverse  order of dismantling.
    
4.2.7      Check  the  blower fan condition and  alignment,  if  necessary  rectify/replace it.
    
4.3.0      Rectification of high pressure in the rooms:
    
4.3.1      The  main  reason of developing high pressure in the  rooms  is  chocking  of  exhaust filters, so clean the  exhaust filters  as   mentioned in the below steps.
    
4.3.2      Remove protection grill by unbolting.
    
4.3.3      Remove exhaust filters from the position.
    
4.3.4      Clean  the  filer with air.  First clean from non  dust  laiden  surface  of  filter (pressure should not exceed 1  kg/cm2)  and  then clean from other side.
    
4.3.5      Clean the filter with water as mentioned in 4.3.4.
4.3.6      Dry the filters with air jet and refix them in position.
    
4.3.7      Fix the protection grill.
    
4.4.0      Rectification of Refrigeration unit of air washer unit:
    
4.4.1      Carry out rectification of refrigeration unit by the authorized agency.
    
4.5        Frequency:  As and when necessary.
    
5.0        RECORDING:
    
    The responsibility of recording the breakdown  rectification in the  history card  lies with the staff of rank not  lower  than   the maintenance supervisor.
    