To  describe   a   standard operating  procedure  (SOP) for  cleaning of solvent recovery column (SC1).

Sharing is caring, show love and share the thread with your friends.

Description

1.0    PURPOSE:
    
    To  describe   a   standard operating  procedure  (SOP) for  cleaning of solvent recovery column (SC1).
    
2.0    SCOPE:
    
    The SOP describes in detail the method for cleaning of solvent recovery column (SC1).
    
3.0    RESPONSIBILITY:
    
    The  responsibility  of cleaning of solvent recovery column  (SC1) as per the SOP lies with the staff of the rank not lower than operator of the production department.
    
    The responsibility of preparing, reviewing and approving the SOP lies with the Officer (Production), Head of Production and Head of QAD  respectively.
    
4.0    METHOD:
    
4.1    Open the charging valve.
    
4.2    Charge 600 L. water into still by using pump. Close the valve.
    
4.3    Heat to reflux and reflux through condenser and rotometers  for 20 min.
    
4.4    Stop  the  steam valve and drain the water  after  opening  the drain valve. Close the drain valve.
    
4.5    The  total time  taken for carrying out steps 4.1 to 4.4  is 4 hours.
    
4.6    Frequency: Cleaning will be done after the completion of  every  batch.
    
5.0    RECORDING:
    
    The cleaning operation will be recorded by the  operator in the equipment cleaning record attached to  the  batch manufacturing sheet and equipment cleaning and use log.

6.0    REFERENCES:
    
6.1    Equipment cleaning record. 
    
6.2    Equipment cleaning and use log 
    

Tags

Production, recovery column, cleaning

References

1.0    purpose:
    
    to  describe   a   standard operating  procedure  (sop) for  cleaning of solvent recovery column (sc1).
    
2.0    scope:
    
    the sop describes in detail the method for cleaning of solvent recovery column (sc1).
    
3.0    responsibility:
    
    the  responsibility  of cleaning of solvent recovery column  (sc1) as per the sop lies with the staff of the rank not lower than operator of the production department.
    
    the responsibility of preparing, reviewing and approving the sop lies with the officer (production), head of production and head of qad  respectively.
    
4.0    method:
    
4.1    open the charging valve.
    
4.2    charge 600 l. water into still by using pump. close the valve.
    
4.3    heat to reflux and reflux through condenser and rotometers  for 20 min.
    
4.4    stop  the  steam valve and drain the water  after  opening  the drain valve. close the drain valve.
    
4.5    the  total time  taken for carrying out steps 4.1 to 4.4  is 4 hours.
    
4.6    frequency: cleaning will be done after the completion of  every  batch.
    
5.0    recording:
    
    the cleaning operation will be recorded by the  operator in the equipment cleaning record attached to  the  batch manufacturing sheet and equipment cleaning and use log.

6.0    references:
    
6.1    equipment cleaning record. 
    
6.2    equipment cleaning and use log 
    