1.0 PURPOSE:
1.1 To lay down a procedure for operation of Milli-Q Water system (Millipore).
2.0 SCOPE:
2.1 This SOP is applicable for operation of Milli-Q water system (Millipore) in Quality control department.
3.0 RESPONSIBILITY:
3.1 Assistant – Quality Control
3.2 Executive – Quality Control
4.0 ACCOUNTABILITY:
4.1 Manager – Quality Control
5.0 PROCEDURE:
5.1 Connect the instrument to 230 volts A/C power supply.
5.2 Connect the feeding water pipe to the system inlet.
5.3 Fix the foot valve with feed water out let pipe.
5.4 Dip the feeding water pipe outlet in to the carboy.
5.5 Switch on the Milli-Q-system, the green indicator glows in the control panel.
5.6 Hold the standby/operate key of the control panel for 3-5 seconds.
5.7 Pre-operate mode displays in the control panel
5.8 Open the gun trigger located at the Q-guard pack.
5.9 Collect the required amount of water and close the gun trigger.
5.10 Hold the stand by/operate key again for 2-3 seconds.
5.11 Stand by mode displays in the control panel.
END OF DOCUMENT
Water purification system, quality control, control panel