PURPOSE:
1.1 To lay down the procedure for operation of WESTERN - COOLER.
2.0 SCOPE:
2.1 This procedure is applicable in Quality Control department.
3.0 RESPONSIBILITY:
3.1 Junior Assistant/Senior Assistant – QC
3.2 Senior Executive – QC
4.0 ACCOUNTABILITY:
4.1 Manager – QC
4.2 Asst. Manager – QC
5.0 PROCEDURE:
5.1 Turn on the mains switch.
5.2 Open the door by pulling it towards us.
5.3 Rotate the knob provided at top compartment in clock-wise or anti-clock-wise and set the temperature as required.
5.4 Close the door by holding the handle and pushing it away from us.
5.5 Do not turn off the mains switch and always keep it under on condition.
Western cooler, clock wise, pushing, knob, pulling