img

SHIFTING OF A HEAVY EQUIPMENT

To  describe  a  standard operating procedure for   shifting  a  heavy equipment. 

Sharing is caring, show love and share the thread with your friends.

Description

1.0 PURPOSE:
    
    To  describe  a  standard operating procedure for   shifting  a  heavy equipment. 
    
2.0    SCOPE:
    
    The standard operating procedure describes in detail the method  of shifting a heavy equipment. 
    
3.0    RESPONSIBILITY:
    
    The responsibility of shifting a heavy equipment lies with  the  maintenance  supervisor  under  the  guidance  of   maintenance  engineer.            
        
The  responsibility of preparing, reviewing  and approving  the   standard  operating  procedure lies with the  Manager  -  Maintenance,  Head of Production and Head of QAD respectively.
    
4.0    METHOD:
    
4.1        Specialised group of people have to attend this work. 

4.2        Heavy  equipment will be lifted from the base with the help  of   chain pulley  block and loaded on a heavy duty trolley. 

4.3        After shifting the equipment to maintenance section or wherever  the  equipment is to be shifted, there also the   chain  pulley   block is to be  used to take out from trolley.

4.4        After necessary rectification of the equipment, the same procedure  should be  repeated  (4.2 and 4.3) to shift back  to  the  place of operation. 

Tags

Shifting a heavy equipment, engineering, qad respectively

References

View / Download