1.0 PURPOSE:
To describe a standard operating procedure for repairing/replacing of agitator/shaft of reactors.
2.0 SCOPE:
The standard operating procedure describes in detail the method of repairing/replacing of agitator/shaft of reactors in the plant.
3.0 RESPONSIBILITY:
The responsibility of repairing/replacing of agitator/shaft of reactors lies with the staff of rank not lower than supervisor of maintenance
The responsibility of preparing, reviewing and approving the standard operating procedure lies with the Manager - Maintenance, Head of Production and Head of QAD respectively.
4.0 METHOD:
4.1 Ensure that the reactor is clean and free of chemicals and obtain the vessel entry permit from the production department.(Annexure-I)
4.2 Isolate the equipment electrically.
4.3 Remove the motor, gear box, shaft coupling, bearing unit and gear box stand from the reactor.
4.4
Unlock the mechanical seal unit (if the reactor is provided with mechanical seal) or loosen the stuffing box bolts, and take out the mechanical seal/stuffing box from the reactor shaft.
4.5 Open the man hole cover by removing all the bolts.
4.6 Arrange filtered air supply to the reactor with air hose. Enter into the reactor wearing nose mask.
4.7 Remove agitator bolts and take out the agitator.
4.8 Remove the shaft from the reactor.
4.9 If the shaft/agitator is to be repaired by outside agency, send the same as per the SOP SENDING OUT EQUIPMENT FOR RECTIFICATION TO THE OUTSIDE AGENCY.If the shaft/agitator is to be replaced with new, get the same and replace.
4.10 Insert the shaft into the reactor.
4.11 Fix the agitator to the shaft.
4.12 Fix the stuffing box/mechanical seal, gear box stand, bearing unit, shaft coupling, gear box and motor in that order.
4.13 Rotate the shaft manually and ensure that the agitator is rotating freely.
4.14 Replace the gland packings as per the SOP replacement of gland packing of pumps and reactors.
4.15 Check the manhole gasket. If it is damaged replace the gasket as per the SOP REPLACEMENT OF GASKETS OF REACTORS MAIN FLANGE, PRESSURE FILTERS AND LEAF FILTERS..
4.16
Restore the power supply to the equipment.
4.17 Record the replacement/repairing data in the equipment history record.
5.0 RECORDING:
The responsibility of recording the repairing/replacing the agitator/shaft in the equipment history card as per the SOP lies with the staff of rank not lower than maintenance supervisor.
Reactors, repairing replacing, engineering