1.0 PURPOSE:
To describe a standard operating procedure for replacement of gaskets of pipe lines/pumps.
2.0 SCOPE:
The standard operating procedure describes in detail the method of replacing gaskets of pipe lines/pumps in the plant.
3.0 RESPONSIBILITY:
The responsibility of replacing gaskets of pipe lines/pumps lies with the staff of rank not lower than junior utility operator of maintenance department.
The responsibility of preparing, reviewing and approving the standard operating procedure lies with the Manager - Maintenance, Head of Production and Head of QAD respectively.
4.0 METHOD:
4.1 Ensure that the pipe line/pump is not in operating condition, empty and is not under pressure.
4.2 In case of pipe lines ensure that valves in the line are shut off and connected equipment are isolated electrically.
4.3 In case of pump isolate the equipment electrically.
4.4 Open all the bolts and nuts/studs of flange/suction cover.
4.5 Remove the old gasket and clean both the surfaces using sharp edged blade.
4.6 Select the suitable gasket material to suit the line material/pump material. The list of gasket materials used for different line material/pumping material is given in Annexure.
4.7 Fix three bolts in loose condition (if there are four holes for the connected flange) in case of pipe line.
4.8 Insert the gasket between the flanges from the fourth unbolted side and incase of pumps place the gasket on the suction cover.
4.9 Ensure that the gasket is centrally located, and then fix the fourth bolt in case of pipe line. In case of pump fix all the studs hand tight.
4.10 Tighten the opposite bolts/studs by observing the central location of the gasket.
4.11 Tighten all the bolts/studs.
4.12 Check for the flange leak after passing fluid in the pipe line/pump.
4.13 If the flange leaks tighten the bolts further till the leakage is arrested.
4.14 Restore the power supply to the equipment in case of pumps and open the line valves incase of pipe lines.