INSTALLING THE FLUID BED DRYER

 To describe  standard operating procedure for installing  the   fluid bed dryer.  

Sharing is caring, show love and share the thread with your friends.

Description

1.0 PURPOSE:
    
    To describe  standard operating procedure for installing  the   fluid bed dryer.       
    
2.0    SCOPE:
    
    The  standard  operating procedure describes  in  detail  the  method of installing   the fluid bed dryer. 
    
3.0    RESPONSIBILITY:
    
    The  responsibility  of installing the fluid bed  dryer  lies  with  the  staff of rank not lower than the  maintenance  engineer of maintenance department. 
              
The responsibility of preparing, reviewing  and approving  the  standard  operating  procedure lies with the Manager  -  Maintenance,  Head of Production and Head of QAD respectively.
    
4.0    METHOD:
    
4.1    Bring the fluid bed dryer to the place of installation.

4.2        Keep  the fluid bed dryer in the position and give steam  connection to the steam inlet.

4.3         Connect the steam trap to the steam condensate line.

4.4         Give  the air connection to the air point.

4.5         Give  the electrical connection to the motor.

4.6         Give earthing to the retarding chamber and  product  container   with  spring loaded earthing arrangement provided on the frame.   Also  give earthing to the dryer body and the motor.

5.0         RECORDING:

    The  responsibility of recording  the installation details  in   the history card   lies with staff of rank not lower than  the   maintenance engineer.  

    
    