MAINTENANCE OF BUILDINGS ROADS FLOORING COMPOUND WALL STRUCTURES ETC

To describe a  standard operating procedure for maintenance  of  buildings, roads, flooring, compound wall, structures etc. 

Sharing is caring, show love and share the thread with your friends.

Description

1.0 PURPOSE:  

    To describe a  standard operating procedure for maintenance  of  buildings, roads, flooring, compound wall, structures etc.     

2.0    SCOPE:
    
     The standard operating procedure describes in detail the method  to  be followed  in maintaining of buildings, roads,  flooring,   compound wall, structures etc., 
    
3.0    RESPONSIBILITY:
    
    The responsibility of carryingout the maintenance of buildings,   roads, flooring, compound wall, structures etc., lies with  the  civil  contractor   under  direct  supervision  of  maintenance  engineer.        
        
The  responsibility of preparing, reviewing  and approving  the  standard  operating  procedure lies with the  Manager  -  Maintenance,  Head of Production and Head of QAD respectively.
    
4.0    METHOD:
    
4.1.0      Routine maintenance.                                       

4.1.1      Check  once  in  a month for any damages  to  walls,  flooring,  ceiling,  drains and effluent ponds, peeling off paints,  water  leaks,  breakage  of window/door glass panes,  pits  on  roads,  holes in compound wall etc.,

4.1.2      Repair/paint them with the help of civil contractors. 

4.2.0      Major maintenance: 

4.2.1      Major  maintenance  is carried out for  upgradation,  modifications,  major  leaks, major damages to floors,  walls,  drains,  effluent  ponds,  compound wall and for painting of  buildings,  structures, equipments etc.,

4.2.2      Carryout major maintenance with the help of civil contractor.
    
4.3.0     Frequency.
    
4.3.1      Routine maintenance: Once in a month or earlier if required by concerned department.
    
4.3.2      Major maintenance  :  Once in a year or earlier if required.   
    
4.3.3    Record the details in an Annexure.
    
5.0        RECORDING:
    
    The  responsibility  of recording the details in  the  register  lies  with  the staff of rank not lower  than  the  supervisor of maintenance  department.
    